12 |
|
 | 6.0.1 |
| |
7 |
|
|  |
7 |
|
 | 5.12 |
| |
10 |
|
|  |
7 |
|
 | 5.10 |
| |
9 |
|
|  |
12 |
|
 | 5.0.8 |
| |
9 |
|
|  |
1 |
|
 | 5.0.5 |
| |
157 |
|  |
5 |
 | Win 95 |
| |
23 |
|  |
177 |
 | Win NT |
| |
114 |
|  |
1 |
|
 | 9.0.1 FP7 |
| |
1 |
|
|  |
1 |
|
 | 9.0.1 |
| |
1 |
|
|  |
7 |
|
 | 8.5.2 |
| |
1 |
|
|  |
1 |
|
 | 8.0.3 |
| |
11 |
|
|  |
30 |
|
 | 8.0.1 |
| |
1 |
|
|  |
5 |
|
 | Calendaring & Scheduling |
| |
 |  |  |  |  | DMLI79RCJK | Date picker is white on white and unreadable if using system color scheme: high contrast black. This problem has been fixed. |  |
| | | | | MDOY74YL8K | When a Calendar doc had a long location and shorter Subject, the Location was truncated. This problem has been fixed. |  |
 |  |  |  |  | MDOY73URGR | Drag and Drop popup time help is now correct time format. |  |
| | | | | MKRT737KY3 | The "Next button" now reads "Next week" in the DateNavigator. |  |
 |  |  |  |  | WDOG75DJHD | No hover window was displayed when the mouse moved onto an empty all day event/anniversary. |  |